PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed Sanitary piping at the 1st floor going into the 2nd floor bathroom 242-244 Facing North.jpg Installed sprinkler branches at the 1st floor Facing West.jpg Installed temporary protection at the South Elevation.jpg Installing sprinkler pipes at the 1st floor Facing North.jpg Metal rack for the electrical equipment at the 2nd floor Facing West.jpg Welding cilps along the column at the 2nd floor North Elevation.jpg Continued constructing metal racks for the electrical equipment at the 4th floor.jpg
Previous pageNext page Installed temporary protection at the South Elevation
Installed temporary protection at the South Elevation